Sweaters, cardigans and knit tops made with partner workshops in Shantou, Guangdong. Orders start at 100 pieces per design, samples take 7–10 days, and every shipment is checked before it leaves China.
JIERQI Clothing is a knitwear sourcing and manufacturing partner in Shantou, China. We handle yarn selection, sampling, production follow-up and final inspection for brands that need sweaters, cardigans and knit tops in orders from 100 pieces.
Written by Felix Zheng · Reviewed 2026-11-01
Four product lines, one sample room and one inspection standard. Each page lists gauges, yarns, MOQ and lead times.
Crewneck, turtleneck, cable and oversized sweaters in 3GG to 14GG.
Open-front, button-front, chunky and slim cardigans with custom trims.
Round-neck, V-neck and sleeveless tops in 12GG and 14GG fine gauge.
Your tech pack, our sampling, grading and bulk production.
Most first orders start as OEM from the brand's own tech pack. ODM is faster when you want an existing style with your label.
| OEM | ODM | Private label | |
|---|---|---|---|
| Who designs | Your brand | Us, from our sample range | Us, with your label |
| Sample time | 7–15 days | 5–7 days | 5–7 days |
| Minimum order | 100 pcs / design | 100 pcs / design | 100 pcs / design |
| Branding | Fully custom | Your label on our style | Your label only |
| Best for | Established fit and fabric | Speed to market | Testing a category |
Waisha Town, Longhu District, Shantou. Flat knitting, linking, finishing and inspection run through partner workshops within a few kilometres of this office. We visit them in person and name them when you ask.
Tech pack, reference garment or sketch, plus quantities and target price.
Costing in 2–3 working days with yarn and trim options.
7–10 days with stock yarns, 10–15 days for custom yarns.
30–45 days after sample approval, with photos at each stage.
AQL 2.5 check, measurements per size, defect photos before packing.
Sea, air or express with export documents prepared for your forwarder.
Short answers with the numbers we quote in 2026. If a question is missing, send it and we will answer it directly.
100 pieces per design for sweaters, cardigans and knit tops. Larger orders lower the unit cost, but the 100-piece minimum stays the same for first orders, including styles with custom yarns.
7–10 days when the yarn is in stock and 10–15 days for custom yarns or complex jacquard patterns. Sampling starts after we confirm the tech pack, measurements and colour references.
AQL 2.5 is the acceptance quality limit used in final inspection under ISO 2859-1. It sets the maximum number of defects allowed in a sample lot, so both sides agree on what passes before the order ships.
Yes. Send a tech pack, a reference garment or a sketch with measurements. We translate it into a knitting spec, make the first sample, and run fit and colour rounds until you approve it.
Yes. Most first orders are 100–300 pieces. We quote per style, not per season, so you can test one design without committing to a full range.
We ship sea, air or express from Shantou or Shenzhen and prepare the packing list, invoice and origin documents. You can use your own forwarder or ask us to arrange one.
01 Nov 2026 · Sourcing Tips
23 May 2026 · Industry Insights
22 May 2026 · Sourcing Tips
Tell us the style, quantity and target price. We reply within one working day with costing and a sampling plan, or with a straight answer if the style is not a fit.