What we can make, how the sampling loop runs, and how a shipment gets checked before it leaves Shantou.
Tech pack, reference garment or sketch, quantities, target price and delivery window.
Costing within 2–3 days, with yarn and trim options laid out.
7–10 days for stock yarns, 10–15 days for custom yarns.
Fit, colour and hand-feel rounds until you sign off.
30–45 days after approval, with photos at knitting, linking and finishing.
AQL 2.5 check, packed cartons photographed, export documents prepared.
Every piece is checked before packing, not just a sample of the run.
Final random inspection against the AQL 2.5 standard, with defect photos.
Spec measurements taken per size and recorded against the tech pack.
Lab dips approved before bulk, and dye-lot matching across the order.
Sea, air or express, arranged with your forwarder or ours. FOB Shantou/Shenzhen and CIF terms are quoted on request.
Our own QC visits the workshop for final inspection. Each order is checked at AQL 2.5 under ISO 2859-1, with measurements per size and defect photos sent before packing.
Yes. Visits can be arranged on working days in Shantou. We tell you which workshop is making your order before the visit.
The lot is reworked or re-inspected before packing. You see the defect report and the re-inspection result before the order ships.
We prepare packing lists, commercial invoices and origin documents, and work with your forwarder or arrange shipping by sea, air or express.